New Dental Office Plumbing — St. Louis Metro
Design-Build Dental Plumbing & Medical Gas from Underground Through Trim
Project Overview
| Location | St. Louis Metro |
|---|---|
| Building type | Healthcare / Dental |
| Scope | Healthcare / Dental — Design-Build New Construction |
| Delivery method | Design-Build |
Legacy Plumbing self-performed the ground-up plumbing and medical gas systems for a new dental office in the St. Louis metropolitan area. The design-build engagement covered underground utilities, above-slab rough-in, medical gas, and finish plumbing.
The project ran as a design-build engagement, so plumbing layout was worked out with the owner and architect before the drawings were final. Design-assist coordination covered fixture locations, operatory rough-in and the routing for medical gas and dental vacuum.
Work followed the normal ground-up sequence. Underground sanitary, storm and domestic water service went in first, ahead of the slab. Above the slab, crews roughed in the multi-operatory plumbing, then ran the NFPA 99 medical gas and dental vacuum systems. Finish work included the water heater, backflow protection and the fixture trim.
Dental offices combine standard commercial plumbing with healthcare systems in a small footprint. Carrying underground, rough-in, medical gas and trim with one self-performing contractor keeps those systems coordinated from the first trench to the last fixture.
This project is an example of our dental & healthcare plumbing work, with scope that also falls under medical gas plumbing. See more of our healthcare plumbing and our coverage for commercial plumbing in St. Louis. For planning tips, read Dental Office Plumbing: Operatories, Vacuum and Air, Sterilization and Rough-In.
Scope of Work — St. Louis, MO
- Underground sanitary, storm, and domestic water service
- Multi-operatory plumbing rough-in
- NFPA 99 medical gas and dental vacuum systems
- Water heater, backflow, and finish fixtures
- Design-assist coordination with owner and architect
Outcomes for the Owner & GC
- Design-build budget held from precon to closeout
- First-pass medical gas certification
- Owner reference for repeat healthcare work
Similar Projects

Dental Office Tenant Finish in Hazelwood
Hazelwood, MO
Full plumbing rough-in and dental/medical gas package for a multi-operatory practice in Hazelwood, MO.
View project scopeDental Plumbing in Webster Groves
Webster Groves, St. Louis County
Dental vacuum and compressed air, fixture connections and existing-system tie-ins in an occupied multi-tenant building.
View project scopeDental Office Plumbing in Vandalia
Vandalia, Audrain County
New dental office plumbing in Vandalia: waste, water, vent, dental vacuum, compressed air, fixtures and backflow protection.
View project scopeNeed a Plumber in St. Louis or the Surrounding Area?
Written bids within one business day, scheduled service Monday–Friday 7am–4pm, and union-trained crews since 1996 across the St. Louis metro and a 2-hour radius.