# Fitness Club Plumbing in St. Peters

> Fitness club restroom and shower plumbing, sensor fixtures, tankless water heating, circulation and drinking fountains.

Canonical: https://legacyplumbingmo.com/projects/fitness-club-plumbing-st-peters-mo
Last updated: 2026-10-27

[All Projects](https://legacyplumbingmo.com/projects) Fitness / Complete Plumbing

Fitness club restroom and shower plumbing, sensor fixtures, tankless water heating, circulation and drinking fountains.

St. Peters, St. Charles County Sector: Fitness / Recreation

## Project Overview

| Location | St. Peters, St. Charles County |
| --- | --- |
| Building type | Fitness / Recreation |
| Scope | Fitness / Complete Plumbing |
| Year | 2024 |

This St. Peters fitness club paired locker-room and restroom fixtures with a multi-heater water heating package. Legacy Plumbing completed plumbing per plan, including battery-powered flush valves and sensor faucets, showers and drinking fountains. Drainage accessories, laundry and service connections were included, while the existing backflow preventer was retained.

This project is an example of our [new construction plumbing](https://legacyplumbingmo.com/services/new-construction) work, with scope that also falls under [backflow prevention & testing](https://legacyplumbingmo.com/commercial/backflow-prevention) . See more of our [the industries we serve](https://legacyplumbingmo.com/who-we-serve) and our coverage for [commercial plumbing in St. Charles County](https://legacyplumbingmo.com/locations/st-charles-county) . For planning tips, read [Underground Plumbing Before the Slab: A Commercial Coordination and Inspection Checklist](https://legacyplumbingmo.com/resources/underground-plumbing-before-the-slab-checklist) .

## Scope of Work — St. Peters, MO

- 10 water closets and 3 urinals with battery-powered flush valves
- 7 lavatories with battery-powered sensor faucets and 6 showers
- 5 floor drains, 3 trap primers, 4 trap guards and 15 cleanouts
- 3 tankless water heaters, an electric water heater, circulation pump and expansion tank
- 2 drinking fountains including a bottle filler
- 4 hose bibbs, service sink and laundry box
- Existing 2½-inch backflow preventer retained

### Documented Scope Outcomes

- Locker-room scope included six showers and sensor-operated lavatories
- Water heating combined three tankless units with an electric water heater
- Existing backflow preventer remained in the installation

### Project Snapshot

- **Location:** St. Peters, St. Charles County
- **Sector:** Fitness / Recreation
- **Type:** Fitness / Complete Plumbing

Fitness Complete Plumbing [Request a Similar Bid](https://legacyplumbingmo.com/contact-us) [Call Estimating](tel:+16369780120)

## Similar Projects

Automotive

### Express Car Wash in St. Louis

St. Louis Metro

Sanitary, storm, and domestic water underground; Reclaim system piping and equipment connections

View project scope Multi-Unit Residential

### Multi-Family Rough-In

St. Louis Metro

Site sanitary, storm, and domestic water; Multi-story sanitary and vent stacks

View project scope Restaurant / Food Service

### Restaurant Plumbing in Crestwood

Crestwood, St. Louis County

Pizza restaurant interior plumbing with kitchen drainage, solids and grease interceptors, water heating and restroom fixtures.

View project scope

## Need a Plumber in St. Louis or the Surrounding Area?

Written bids within one business day, scheduled service Monday–Friday 7am–4pm, and union-trained crews since 1996 across the St. Louis metro and a 2-hour radius.

[Get Free Estimate](https://legacyplumbingmo.com/contact-us) [636-978-0120](tel:+16369780120)

## Related
- [Contact Legacy Plumbing](https://legacyplumbingmo.com/contact-us)
- [Company facts](https://legacyplumbingmo.com/company-facts)
- [All pages (llms.txt)](https://legacyplumbingmo.com/llms.txt)
