# Cold Storage Facility in Foristell Project

> Cold Storage Facility in Foristell; Foristell, MO; Industrial Cold Storage — New Construction; Site utilities: sanitary sewer, storm, and domestic water.

Canonical: https://legacyplumbingmo.com/projects/cold-storage-facility-foristell-mo
Last updated: 2026-10-08

[All Projects](https://legacyplumbingmo.com/projects) Industrial Cold Storage — New Construction

Ground-Up Industrial Plumbing & Site Utilities for a Cold Storage & Trucking Facility off I-70

Foristell, MO Sector: Industrial / Cold Storage

## Project Overview

| Location | Foristell, MO |
| --- | --- |
| Building type | Industrial / Cold Storage |
| Scope | Industrial Cold Storage — New Construction |

Legacy Plumbing self-performed the ground-up commercial plumbing scope on phase one of the industrial cold storage campus in Foristell, Missouri. The 100,000+ sq ft distribution center sits less than a mile from Interstate 70 and anchors a three-phase industrial development serving Missouri transportation, warehousing, and cold-chain logistics.

This project is an example of our [industrial plumbing](https://legacyplumbingmo.com/commercial/industrial-plumbing) work, with scope that also falls under [new construction plumbing](https://legacyplumbingmo.com/services/new-construction) . See more of our [manufacturing and industrial plumbing](https://legacyplumbingmo.com/industries/industrial-manufacturing) and our coverage for [commercial plumbing in Foristell, MO](https://legacyplumbingmo.com/service-area/foristell-mo) . For planning tips, read [Underground Plumbing Before the Slab: A Commercial Coordination and Inspection Checklist](https://legacyplumbingmo.com/resources/underground-plumbing-before-the-slab-checklist) .

## Scope of Work — Foristell, MO

- Site utilities: sanitary sewer, storm, and domestic water service
- Underground plumbing rough-in coordinated with cold-storage slab pours
- Floor drains and piping rated for refrigerated warehouse loads
- Backflow prevention (RPZ) and water heater installation
- GC coordination through BIM/VDC and Leica total-station layout

### Outcomes for the Owner & GC

- Delivered on the GC's fast-track cold storage schedule
- Zero re-work through owner sign-off on domestic and sanitary systems
- Positioned for phase two and three build-out on the same campus

### Project Snapshot

- **Location:** Foristell, MO
- **Sector:** Industrial / Cold Storage
- **Type:** Industrial Cold Storage — New Construction

Industrial New Construction Cold Storage [Request a Similar Bid](https://legacyplumbingmo.com/contact-us) [Call Estimating](tel:+16369780120)

## Similar Projects

Industrial

### Manufacturing Facility in St. Peters

St. Peters, MO

Commercial plumbing systems for an industrial manufacturing facility, including domestic water, sanitary, and equipment connections.

View project scope Industrial / Manufacturing

### Plant Cafeteria Plumbing in St. Louis

St. Louis, City of St. Louis

Cafeteria and restroom renovation in an operating pharmaceutical plant, with existing-system tie-ins, showers and water heating.

View project scope Education

### Middle School Renovation in St. Charles

St. Charles, MO

Interior additions and remodeling — tenant finish renovations coordinated around an active school campus for the school district.

View project scope

## Need a Plumber in St. Louis or the Surrounding Area?

Written bids within one business day, scheduled service Monday–Friday 7am–4pm, and union-trained crews since 1996 across the St. Louis metro and a 2-hour radius.

[Get Free Estimate](https://legacyplumbingmo.com/contact-us) [636-978-0120](tel:+16369780120)

## Related
- [Contact Legacy Plumbing](https://legacyplumbingmo.com/contact-us)
- [Company facts](https://legacyplumbingmo.com/company-facts)
- [All pages (llms.txt)](https://legacyplumbingmo.com/llms.txt)
